Projects
Network of the Mělník Municipal Office
2023–2025
I physically and logically mapped the office network, including connections to the virtualization infrastructure, and produced a topology diagram. I reviewed the proposed new LAN topology and the tender documentation for the active elements procurement.
- scripts for reporting port utilization and MAC addresses on switches,
- DMZ and FortiGate rules for the new municipal police server,
- 802.1X with smart card authentication,
- centralized logging and notifications from monitoring,
- implementation of diesel generator monitoring (creating a proxy between MQTT and Zabbix, Zabbix configuration).